Email : md@sgbcco.com
Call Us : 021-88874439-40
SGBC Co.
Sina 1- PGFK

Sina 1- PGFK


Location : BANDAR ABBAS

Client : AOM-PGFK

Status : Completed

Type : Mechanical steel work

SGBC (Sanat Gostar Bavi Co.) involved in major refurbishment and repair project of oil drilling rig SINA-1 belonging to PGFK Co. (Petro Gohar Farasahel Kish Co.) at the year 2015.

Here are the services which served by SGBC during SINA-1 project:

  1. Major overhauling of 3 each main generators EMD-645 engines (V-16).
  2. Service of 3 each main generators alternators (2.2 MW)
  3. Major overhauling of CATERPILLAR -3412 engine (V-12).
  4. Service of emergency generator alternator (780 KW)
  5. Major overhauling of main diesel compressor Mitsubishi engine.
  6. Design, installation & commissioning of diesel generators control systems plus alarm/safety monitoring system.
  7. Water ballast project of 3 each legs of Oil Drilling Rig SINA-1
  8. Leg Brace Renewal & Chord straightness Project. (75 esch leg braces renewal)
  9. Leg Painting Project
  10. Leg Anode Replacement Project
  11. Ballast Tank Coating Project

HL 5000 Refabrication-DOT

HL 5000 Refabrication-DOT


Location : oman - DOC , bushehr -IRAN

Client : DOT

Status : Completed

Type : Mechanical steel work

  • Major overhauling of two each double drum positioning winches of HL-5000 (Client: DOT)
  • Major overhauling of two each double drum positioning winches of HL-5000 (Client: DOT)
  • Completely dismantling of main and auxiliary hooks of HL-5000 barge main crane, modifying and fabrication of some parts of the same (shafts, bushings, distance pieces, dividing plates…), sand blasting and painting all parts, chrome plating of main shafts at Bushehr port. Boxing up and reassembling the hooks at Oman ODC. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Performing about 50 ton steel work in cutting, fabricating, modifying, fitting up and welding of winch house , aft deck plating and beams of HL-5000 barge at Bushehr port and Oman ODC. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Completely disassembling, repairing and modifying of two each boom seats of HL-5000 barge. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Laser scanning the HL-5000 barge deck area to position the exact location of HL-5000 both boom masts, installing, fitting up and welding the same on deck. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Installing and commissioning of 6 each electrical winch on aft deck of HL-5000 barge. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Completely checking out of all 4 each main hoist, auxiliary hoist and boom winches of HL-5000 barge. Performing load test on the same and submitting test reports. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Completely disassembling of 8 each load cell blocks of HL-5000 positioning winches, servicing and easing up all rotating sheaves, boxing up the same with using new load cell elements. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Completely dismantling of main and auxiliary hooks of HL-5000 barge main crane, modifying and fabrication of some parts of the same (shafts, bushings, distance pieces, dividing plates…), sand blasting and painting all parts, chrome plating of main shafts at Bushehr port. Boxing up and reassembling the hooks at Oman ODC. ( Client: DOT, Main Contractor: Ocean-Us Co. )
 
  • Performing about 50 ton steel work in cutting, fabricating, modifying, fitting up and welding of winch house , aft deck plating and beams of HL-5000 barge at Bushehr port and Oman ODC. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Completely disassembling, repairing and modifying of two each boom seats of HL-5000 barge. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Laser scanning the HL-5000 barge deck area to position the exact location of HL-5000 both boom masts, installing, fitting up and welding the same on deck. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Installing and commissioning of 6 each electrical winch on aft deck of HL-5000 barge. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Completely checking out of all 4 each main hoist, auxiliary hoist and boom winches of HL-5000 barge. Performing load test on the same and submitting test reports. ( Client: DOT, Main Contractor: Ocean-Us Co. )
  • Completely disassembling of 8 each load cell blocks of HL-5000 positioning winches, servicing and easing up all rotating sheaves, boxing up the same with using new load cell elements. ( Client: DOT, Main Contractor: Ocean-Us Co. )

Abouzar1200 crane repair-KITO

Abouzar1200 crane repair-KITO


Location : AB-114

Client : KITO - IOEC

Status : Completed

Type : Mechanical steel work

  • Installing 4 each Deep Sea electronic boards (DSE8610) on main switch board of CLB Annette diesel generators, replacing the generator’s AVRs and setting up the load sharing and paralleling system of generators, all 4 each governors overhauled. All engines safety systems designed and installed. (IOEC-KITO):

* 4 synchronizing panel changed by deep sea .dse8610

* 4 AVR changed by STAMFORD 90v 15a parall.

* All switch board safeties (Under Voltage, Preferential Trip, Low frequency, High Voltage, Over Current, and Reverse Power Trip) renewed.

* All governor servomotors changed by new ones.

* All hydraulic governors overhauled and set by specialist.

  • Designing, fabricating and installing the electrical control panels (IP-65) of AB-114 positioning winches. (IOEC-KITO)

  • Sand blasting and painting of CLB Annette crane boom. Also changing 22 each defective boom lacings on the same. (IOEC-KITO)

  • Overhauling the port & starboard bank sheaves of 1200 ton main crane boom on AB-1200. The shafts extracted out and properly checked, starboard side shaft found to be defective, one new shaft fabricated and then both sheave’s banks boxed up with using new bearings. (IOEC-KITO)

  • Piping job on Reina-250. Designing, fabricating, fitting up and welding the piping system in E/R. (IOEC-KITO)

  • Piping job on MV. Scorpion. Designing, fabricating, fitting up and welding the piping system in E/R. (Arvand Offshore Co.)
  • Servicing and repairing 4 each positioning winches on AB-114. (IOEC-KITO)

  • Servicing & repairing the air conditioning system on AB-114. (IOEC-KITO)

  • Securing the davits of MV. Persian Pearl life boats, cutting the defective base of davits, designing and fabricating new foundation and base for davits and welding on the same. (IOEC-KITO)


CLB Annet complete overhauling

CLB Annet complete overhauling


Location : AB-1200

Client : KITO - IOEC

Status : Completed

Type : Mechanical steel work

  • Sand blasting and painting of CLB Annette crane boom. Also changing 22 each defective boom lacings on the same. (IOEC-KITO)

  • Overhauling the port & starboard bank sheaves of 1200 ton main crane boom on AB-1200. The shafts extracted out and properly checked, starboard side shaft found to be defective, one new shaft fabricated and then both sheave’s banks boxed up with using new bearings. (IOEC-KITO)

  • Piping job on Reina-250. Designing, fabricating, fitting up and welding the piping system in E/R. (IOEC-KITO)

  • Piping job on MV. Scorpion. Designing, fabricating, fitting up and welding the piping system in E/R. (Arvand Offshore Co.)
  • Servicing and repairing 4 each positioning winches on AB-114. (IOEC-KITO)

  • Servicing & repairing the air conditioning system on AB-114. (IOEC-KITO)

  • Securing the davits of MV. Persian Pearl life boats, cutting the defective base of davits, designing and fabricating new foundation and base for davits and welding on the same. (IOEC-KITO)

MAJOR OVER HAULING

MAJOR OVER HAULING


Location : mv. younos

Client : azar pad kish

Status : Completed

Type : Mechanical steel work

  • Steel job on MV. Baluch for younos fishing Co. Cutting the deck plates, fitting up and welding new plates.

  • Performing the service job and overhauling the life boat engine of MV. Baluch(Yanmar Engine) for younos fishing company.

  • Overhauling the diesel generator (8QV-Dorman engine) on MV. Baluch for younos fishing company.

  • Overhauling the main diesel generator engine (Deutz-628) on MV. Baluch. Removing the crankshaft of the same, grinding and then boxing up with utilizing undersize bearings for younos fishing company.

  • Top overhauling of main engine of MV. Baluch (Model: Deutz-540) plus complete overhauling of its two units for younos fishing company.

  • Designing and installing new alarm monitoring and safety control system for general alarms, diesel generator and main engine of MV. Baluch for younos fishing Co.

  • Major overhauling of two each diesel generators Daihatsu engines of MV. Siraff for younos fishing Co.

  • Major overhauling of main engine Gear Box on MV. Jahan Ara.